Project Summary

VERTEX redefined the entire process of mine development projects in the Philippines.It only took 6 months from the preliminary investigation,exploration, environmental assessment,production line design,feasibility demonstration and investment return analysis phase to equipment production,construction, installation,finetune and commission phase.At the same time,an optimal balance was achieved between highest production efficiency,most environmentally friendly,fastest production,and highest return on investment.It is a typical case with the highest overall planning efficiency,the most scientific equipment production plan and on-site installation,and the most efficient production and operation.

Contect Us

Home  >VERTEX News